Malvern Street Sewer Upgrade

This sewer upgrade project in Dunedin started with a temporary design and installation diversion flume to divert flow whilst exposing and protecting the 1943 sewer and installing the new floodway structure on the left of The Leith and then moving the flume. Over 280 m3 of concrete was placed into the stream bed all whilst keeping The Leith flowing past the site. This upgrade will now protect the sewer pipeline beneath the stream and reinforcing the surrounding area to protect and prevent further erosion and damage.

-        CCNZ Otago – Project of the year winner 2023

-        IPWEA NZ Assest Management Excellence Award 2022

Malvern Street sewer project - YouTube

Client
Isaac

Completed
April 2022

Southland Civil Contractor Awards

Hynds Construction Awards granted award in March 2023 winning the project category at the Otago CCNZ Contractor of Year awards. Credit to Isaac Construction, Dunedin City Council & WSP. Job completed March 2022 - Malvern street Dunedin. 

Previous
Previous

Queenstown Street Furniture

Next
Next

McIntosh Drain Pump Station